We have been fencing and van-ing this weekend. The new NER design fence has been extended alongside the Camping Coach and the area levelled and tidied up as we progressed. 17 posts were installed in holes 3’ deep.
The CCT has been placed alongside the Up platform by the PW Dept during the week. This has allowed us direct access off the platform for installing the new doors on the East side. The first activity was removing the final original door, some of it by shovel. Although the wood work was rotten the metalwork is not too bad. The metalwork has now been cleaned down and primed.
The new doors have been offered into place and are temporarily held in place. This is the first time in over 20 years that the van has had all its doors fitted!
The type 1 stone has been transported into the paddock and the site is ready now for the BR sectional hut to be re-erected.